This position is part of the Bonneville Power Administration, Department of Energy, Transmission Services, Transmission Student Development. As a Public Utilities Specialist (Rates) (Recent Grad), you will serve in a developmental capacity as an analyst in evaluating the development of short and long-term business strategy, market monitoring, revenue tracking and forecasting.
As a Public Utilities Specialist (Rates), you will: Performs processes that support rate setting, including providing assistance in maintaining the rates model for Transmission. Participates in and supports the development and presentation of rate design analysis and recommendations. Collaborates with senior staff to perform work in alignment with technical work plans. Conducts rate design analysis to support the development of Transmission policy, strategies, and rate design methodology. Supports the implementation, modification, and maintenance of systems e.g., data, modeling, connections to other marketing efforts, etc.
This vacancy has a positive education requirement. In order to be rated as qualified, you must provide copies of your college transcripts. Failure to provide copies of your college transcripts may result in a rating of "Ineligible". Foreign education must be reviewed by an organization recognized by the U.S. Department of Education. For special instructions pertaining to foreign education and a list of organizations that can evaluate foreign education, see the Department of Education website.DO NOT email or mail in any of your application documents. Documents will not be accepted outside of the online application system. Must submit transcripts with your application for proof of education and degree conferred date. DO NOT email or mail in any of your application documents. Documents will not be accepted outside of the online application system.
bmfallsdown@bpa.gov 503-230-0000
Source: USAJOBS.gov — U.S. Federal Government
Apply on official site →